Central Mainland Bridge 1 | Bridge Constructor

Bridge Constructor Central Mainland Bridge 1


Comments

Central Mainland Bridge 1 | Bridge Constructor — 3 Comments

  1. Can be solved for 7600/10000 using a “peace sign” on each pillar – two vertical supports on top of each other, each one is two units tall, and a triangle formed with two supports from the point between the two vertical pillars up to the roadway points on either side of the vertical supports. Sure wish I knew how to attach a picture.

Leave a Reply

Your email address will not be published.