Westlands Bridge 4 | Bridge Constructor

Bridge Constructor Westlands Bridge 4


Comments

Westlands Bridge 4 | Bridge Constructor — 1 Comment

  1. It can also be solved for $50 less (4900/7000) using a triangle below (from roadway points 3 and 4 down to the pillar) and a one-unit-tall triangle, above (from roadway point 1 [the left-most], up and over to one unit above point 2, then down and over to point 3, with a vertical support from point 2 to the peak). Sorry, don’t know the right way to attach a picture.

Leave a Reply

Your email address will not be published.